TGSacoustics helps to clarify the decision to grant planning consent. The Inspector wrote that “The evidence before me is more extensive and objective than that available to the Inspector in 2015”.
Full report: http://democracy.merthyr.gov.uk/documents/s34562/P160010.pdf